Space Station
Design study for a large crewed spacecraft / station, loosely in the spirit of the Star Fleet Technical Manual (Franz Joseph, 1975): orthographic blueprints, deck cutaways, systems breakdowns — grounded in real physics and real launch logistics.
Planned contents
docs/— concept, mission, design decisionsblueprints/— orthographic views (SVG), deck plans, cutawaysanalysis/— mass budget, Starship launch count, power/thermal/radiation sizing
Versioning
Every change is a release: python3 release.py "what changed" bumps the patch version (--minor, --major), updates CHANGELOG.md, regenerates sheets + page, tags, pushes and deploys.
Web page
Live: https://laantungir.net/space_station/ — build with THEME=paper python3 blueprints/generate.py && python3 web/build.py, deploy to /var/www/html/space_station/.
CAD (master model)
params.py is the single source of truth. cad/ship.py (build123d, in .venv) builds every part as a solid and exports:
cad/out/ship.step(open in FreeCAD/Fusion/Onshape),cad/out/parts.json(volumes/areas per part)web/js/ship.glb(the live 3D view on the web page) Setup:python3 -m venv .venv && .venv/bin/pip install build123d
Design to-do
Sections of a full ship's technical manual, mapped onto this ship. [x] = done or started.
00 · General
- Foreword & general data — Mission, baseline numbers (done). Add a revision index & sheet register.
- Charter & regulations — Ownership, crew contract, governance in transit, legal status at Ceres.
- Flags, seals & insignia — Ship name, mission patch, hull markings.
- Uniforms & ranks — Crew roles, department colours, suits/IVA wear.
- Other vehicles — Starship variants, tankers, depots: the fleet that builds and supplies us.
01 · Command
- Organization & bases — Earth ground support, LEO assembly yard, Ceres outpost.
- Standing orders — Mission rules, abort criteria, emergency procedures.
- Classification & 3-views — BP-03 side elevation, BP-01 end view, BP-06 cutaway (all from CAD). Need: front view, isometric, scale comparison (ISS / Enterprise).
- Complement & quarters — 300-crew roster by department, cabin plan, watch schedule. Segment types H/F/V (cabins, family suites, guests) done; roster + watch schedule still open.
- Bridge / control centre — Location (hub vs ring), consoles, layout drawing. Ring control segment C done.
- Defenses — Radiation storm shelter, micrometeoroid shielding, debris avoidance. Storm shelter segment S done.
- "Weaponry" — Reinterpret as mining tools: drills, mass driver, sample probes.
02 · Sciences
- Science station & labs — Zero-g labs in hub, geology/assay lab for ore. Ring lab segment Q done.
- Computer systems — Avionics, network topology, redundancy schematic.
- Science equipment — Telescopes, prospecting sensors, drone fleet.
- Navigation & charts — BP-00 solar map done. Need: trajectory/transfer plot, belt target chart.
- Medical section — Sickbay plan, surgery, radiation & low-g health. Medical segment M done.
- Food health standards — Nutrition budget, food storage per crew-year.
03 · Support services
- Communications — Antennas, laser comm, light-delay at Ceres.
- Environmental systems — Life support: O₂, CO₂, water loop, thermal; mass & power budget. Life-support segment L + common plenum/utility bay done.
- Engineering section — Engineering control layout. Electrical segment E + workshop W done.
- Structural details — BP-02 segment section, BP-07 hub bearing & despun joint done. Need: spoke truss detail.
- Main propulsion — Belt mission sizing done. Need: thruster cluster drawing & propellant tanks.
- Electrical power — Solar array sizing at 2.77 AU, batteries, distribution schematic. BP-08 panels, ring DC buses, E segment done.
- Ship's controls — Attitude control, spin-up/down, ring balancing (moving mass).
- Food preparation — Galley, greenhouse decks. Galley G + hydroponics A segments done.
- Sanitary recovery — Waste & water reclamation.
- "Transporters" — Reinterpret: spoke elevators & internal transit.
- Hangar deck — Docking ports, shuttle/lander bay, maintenance.
- Repair shops & fabrication — Machine shop, 3D printing, EVA workshop. Workshop segment W done.
- Materials reconversion — Ore processing, ice → water/propellant plant.
- Chemophotosynthesis — Bioregenerative farming, algae, food yield per m². Hydroponics segment A done; yield model still open.
- Cargo facilities — Ore & ice holds, return cargo capacity. Ring stores segment K done; ore holds still open.
- Recreation & gymnasia — Commons, gym, sports in 1 g ring. Segments R + X done.
Next sheets
BP-11 front view & size comparison · BP-12 Earth→Ceres trajectory plot · BP-13 power & life-support budget.