issue: update 4bc5 - add session progress, key findings, and next session plan
This commit is contained in:
@@ -36,11 +36,23 @@ relay.ngit.dev currently runs ngit-relay (reference implementation). We want to
|
||||
|
||||
### Migration Execution
|
||||
|
||||
- [ ] Run analysis scripts on relay.ngit.dev
|
||||
- [x] Run analysis scripts on relay.ngit.dev
|
||||
- [ ] Review action-required repos, make decisions
|
||||
- [ ] Execute migration (switch domain, disable archive mode)
|
||||
- [ ] Validate migration success
|
||||
|
||||
### Next Session Tasks
|
||||
|
||||
- [ ] **Investigation:** Analyze why 315 repos didn't sync to archive
|
||||
- [ ] **Investigation:** Review 5 repos needing manual investigation
|
||||
- [ ] **Decision:** Choose migration approach (gradual vs full switch)
|
||||
- [ ] **Decision:** Determine when to merge branch to main
|
||||
- [ ] **Preparation:** Create migration checklist and rollback plan
|
||||
- [ ] **Execution:** Switch relay.ngit.dev domain to ngit-grasp
|
||||
- [ ] **Execution:** Disable archive mode
|
||||
- [ ] **Validation:** Run post-migration validation
|
||||
- [ ] **Cleanup:** Merge branch to main, close issue
|
||||
|
||||
## Progress
|
||||
|
||||
### 2026-01-23 [Session 16:00]
|
||||
@@ -179,12 +191,249 @@ relay.ngit.dev currently runs ngit-relay (reference implementation). We want to
|
||||
- Easy rollback: remove `?ref=...` from flake input, rebuild (~5 min)
|
||||
- Timeline: ~2 hours for complete validation
|
||||
|
||||
**Next Steps:**
|
||||
1. Push branch to remote
|
||||
2. Update nixos-config and deploy
|
||||
3. Run migration analysis
|
||||
4. Validate structured logging
|
||||
5. Merge to main after validation
|
||||
### 2026-01-23 [Session 14:00]
|
||||
- **Deployed branch to VPS** - Successfully updated nixos-config to use branch
|
||||
- **Ran full migration analysis** - All 5 phases completed successfully
|
||||
- **Resolved issues during deployment:**
|
||||
- Git not available in systemd service environment (added to PATH)
|
||||
- Script path discovery issues (fixed with proper directory detection)
|
||||
- Phase 2 script missing (created `10-check-git-sync.sh`)
|
||||
- **Updated migration guide** with lessons learned and gotchas section
|
||||
|
||||
**Analysis Results (relay.ngit.dev):**
|
||||
|
||||
| Category | Count | Notes |
|
||||
|----------|-------|-------|
|
||||
| Complete in both | 231 | No action needed |
|
||||
| Complete in prod, MISSING from archive | 315 | **Needs investigation** |
|
||||
| Empty in both | 100 | Users never pushed |
|
||||
| In archive only | 4 | Deleted from prod? Or new? |
|
||||
| No match (refs differ) | 1 | Manual investigation |
|
||||
| Purgatory expiry events | 382 | Logged successfully |
|
||||
|
||||
**Key Findings:**
|
||||
1. **315 repos missing from archive** - This is the main concern. Archive service is running but these repos didn't sync.
|
||||
2. **382 purgatory expiry events** - Structured logging working correctly
|
||||
3. **5 repos need manual investigation** - 4 in archive only, 1 with mismatched refs
|
||||
4. **100 empty repos** - Expected (users created but never pushed)
|
||||
|
||||
**Current State:**
|
||||
- VPS running ngit-grasp from branch `4bc5-relay-ngit-dev-migration-v2`
|
||||
- Archive service syncing from relay.ngit.dev (prod ngit-relay)
|
||||
- All migration scripts working correctly
|
||||
- Structured logging producing expected output
|
||||
|
||||
**Outstanding Questions:**
|
||||
1. Why didn't 315 repos sync to archive? Is this expected or a bug?
|
||||
2. What are the 4 repos in archive but not prod? (deleted? or new?)
|
||||
3. What's the 1 repo with mismatched refs?
|
||||
4. Should we do gradual cutover or full switch?
|
||||
5. When to merge branch to main?
|
||||
|
||||
## Key Findings (Analysis Results)
|
||||
|
||||
**Summary from 2026-01-23 analysis run:**
|
||||
|
||||
| Metric | Value |
|
||||
|--------|-------|
|
||||
| Total repos in prod | 654 |
|
||||
| Total repos in archive | 268 |
|
||||
| Repos synced correctly | 231 |
|
||||
| Repos missing from archive | 315 |
|
||||
| Empty repos (never pushed) | 100 |
|
||||
| Repos needing manual review | 5 |
|
||||
| Purgatory expiry events | 382 |
|
||||
|
||||
**Breakdown of 5 manual investigation repos:**
|
||||
- 4 repos exist in archive but NOT in prod (possible deletions or new repos)
|
||||
- 1 repo has mismatched refs between prod and archive
|
||||
|
||||
**Interpretation:**
|
||||
- 231 repos (35%) synced correctly - archive mode working
|
||||
- 315 repos (48%) missing - need to understand why
|
||||
- 100 repos (15%) empty - expected, users never pushed
|
||||
- 5 repos (1%) need manual review - small number, manageable
|
||||
|
||||
## Next Session Plan
|
||||
|
||||
### Phase 1: Investigation (1-2 hours)
|
||||
|
||||
**Goal:** Understand why 315 repos didn't sync and review the 5 manual investigation repos.
|
||||
|
||||
**Tasks:**
|
||||
|
||||
1. **Investigate 315 missing repos:**
|
||||
- Check if archive service was running during their creation
|
||||
- Look at timestamps: were these created before archive mode was enabled?
|
||||
- Check if there's a pattern (specific users, time periods, repo sizes)
|
||||
- Review archive service logs for errors
|
||||
- Determine if this is expected behavior or a bug
|
||||
|
||||
2. **Review 5 manual investigation repos:**
|
||||
- **4 repos in archive only:** Check if they were deleted from prod, or if they're new repos created on archive
|
||||
- **1 repo with mismatched refs:** Compare refs between prod and archive, determine which is correct
|
||||
|
||||
3. **Validate archive mode is working:**
|
||||
- Create a test repo on prod, verify it syncs to archive
|
||||
- Check archive service health and connectivity
|
||||
|
||||
**Decision Points:**
|
||||
- Is the 315 missing repos a bug that needs fixing before migration?
|
||||
- Or is it expected (repos created before archive mode)?
|
||||
- Do we need to manually sync these repos?
|
||||
|
||||
### Phase 2: Decision Making (30 min)
|
||||
|
||||
**Goal:** Make key decisions about migration approach.
|
||||
|
||||
**Decisions to make:**
|
||||
|
||||
1. **Migration approach:**
|
||||
- **Option A: Full switch** - Change DNS, disable archive mode, done
|
||||
- **Option B: Gradual cutover** - Run both in parallel, migrate users gradually
|
||||
- **Recommendation:** Full switch is simpler if we're confident in the data
|
||||
|
||||
2. **Handling 315 missing repos:**
|
||||
- **Option A: Accept the gap** - These repos exist in prod, users can still access them
|
||||
- **Option B: Manual sync** - Copy git data from prod to archive before switch
|
||||
- **Option C: Re-announce** - Have users re-announce their repos after migration
|
||||
|
||||
3. **Branch merge timing:**
|
||||
- **Option A: Merge before migration** - Cleaner, but can't easily rollback
|
||||
- **Option B: Merge after migration** - Can rollback to main if issues
|
||||
- **Recommendation:** Merge after successful migration validation
|
||||
|
||||
4. **Create migration checklist:**
|
||||
- Pre-migration checks
|
||||
- Migration steps
|
||||
- Post-migration validation
|
||||
- Rollback procedure
|
||||
|
||||
### Phase 3: Pre-Migration Preparation (1-2 hours)
|
||||
|
||||
**Goal:** Prepare everything needed for migration execution.
|
||||
|
||||
**Tasks:**
|
||||
|
||||
1. **Address investigation findings:**
|
||||
- If 315 repos is a bug: fix it and re-run analysis
|
||||
- If expected: document and proceed
|
||||
- Handle the 5 manual investigation repos
|
||||
|
||||
2. **Re-run analysis if needed:**
|
||||
- If any fixes were made, re-run to verify
|
||||
- Ensure numbers are stable
|
||||
|
||||
3. **Prepare rollback plan:**
|
||||
- Document exact steps to revert to ngit-relay
|
||||
- Test rollback procedure (dry run)
|
||||
- Ensure backups are in place
|
||||
|
||||
4. **Create migration runbook:**
|
||||
- Step-by-step commands
|
||||
- Expected outputs at each step
|
||||
- Verification checks
|
||||
- Contact info for escalation
|
||||
|
||||
5. **Notify stakeholders:**
|
||||
- Announce maintenance window (if needed)
|
||||
- Prepare status page update
|
||||
|
||||
### Phase 4: Migration Execution (1-2 hours)
|
||||
|
||||
**Goal:** Execute the migration and validate success.
|
||||
|
||||
**Pre-Migration Checklist:**
|
||||
- [ ] All investigation items resolved
|
||||
- [ ] Rollback plan documented and tested
|
||||
- [ ] Backups verified
|
||||
- [ ] Stakeholders notified
|
||||
|
||||
**Migration Steps:**
|
||||
|
||||
1. **Switch domain to ngit-grasp:**
|
||||
- Update DNS or reverse proxy configuration
|
||||
- Point relay.ngit.dev to ngit-grasp service
|
||||
- Verify connectivity
|
||||
|
||||
2. **Disable archive mode:**
|
||||
- Update ngit-grasp configuration
|
||||
- Restart service
|
||||
- Verify archive mode is disabled
|
||||
|
||||
3. **Validate services:**
|
||||
- Test WebSocket connection to relay.ngit.dev
|
||||
- Test git clone/push operations
|
||||
- Verify existing repos are accessible
|
||||
- Check event propagation
|
||||
|
||||
4. **Monitor for issues:**
|
||||
- Watch logs for errors
|
||||
- Monitor resource usage
|
||||
- Check for user reports
|
||||
|
||||
**Post-Migration Validation:**
|
||||
- [ ] WebSocket connections working
|
||||
- [ ] Git operations working
|
||||
- [ ] Existing repos accessible
|
||||
- [ ] New repos can be created
|
||||
- [ ] Events propagating correctly
|
||||
- [ ] No error spikes in logs
|
||||
|
||||
### Phase 5: Post-Migration Cleanup (30 min)
|
||||
|
||||
**Goal:** Finalize migration and clean up.
|
||||
|
||||
**Tasks:**
|
||||
|
||||
1. **Merge branch to main:**
|
||||
- Create PR from `4bc5-relay-ngit-dev-migration-v2` to `main`
|
||||
- Review changes
|
||||
- Merge and delete branch
|
||||
|
||||
2. **Update nixos-config:**
|
||||
- Remove `?ref=...` from flake input
|
||||
- Point back to main branch
|
||||
- Rebuild to verify
|
||||
|
||||
3. **Update documentation:**
|
||||
- Mark migration guide as tested/validated
|
||||
- Add any lessons learned
|
||||
- Update architecture docs if needed
|
||||
|
||||
4. **Archive analysis results:**
|
||||
- Save analysis output for future reference
|
||||
- Document final state
|
||||
|
||||
5. **Close issue:**
|
||||
- Update progress with final status
|
||||
- Move to closed/ directory
|
||||
|
||||
**Success Criteria:**
|
||||
- [ ] relay.ngit.dev running ngit-grasp
|
||||
- [ ] All existing repos accessible
|
||||
- [ ] New repos can be created
|
||||
- [ ] No degradation in service
|
||||
- [ ] Branch merged to main
|
||||
- [ ] Issue closed
|
||||
|
||||
## Contingency Plans
|
||||
|
||||
**If 315 missing repos is a critical bug:**
|
||||
- Pause migration
|
||||
- Fix the bug in ngit-grasp
|
||||
- Re-deploy and re-run analysis
|
||||
- Resume migration when fixed
|
||||
|
||||
**If migration causes issues:**
|
||||
- Execute rollback plan (revert to ngit-relay)
|
||||
- Investigate root cause
|
||||
- Fix and retry
|
||||
|
||||
**If archive data is corrupted:**
|
||||
- Restore from backup
|
||||
- Re-sync from prod
|
||||
- Retry migration
|
||||
|
||||
## Notes
|
||||
|
||||
@@ -192,3 +441,4 @@ relay.ngit.dev currently runs ngit-relay (reference implementation). We want to
|
||||
- **VPS:** Running NixOS
|
||||
- **Old worktree:** Can reference `/persistent/dcdev/clones/ngit-grasp/worktrees/820a-relay-ngit-dev-migration/` for existing scripts and learnings
|
||||
- **Target:** Simple, practical migration guide that works
|
||||
- **Branch deployed:** `4bc5-relay-ngit-dev-migration-v2` currently running on VPS
|
||||
|
||||