Claude 6579b5f656 docs: audit, status-stamp, and index all module plans
Audited all 143 plan files across the 10 plans/ folders. Each plan now
carries a Status header (shipped | in-progress | queued | abandoned)
backed by codebase evidence, and every folder has a README.md index
grouping plans by status.

Shipped plans were moved into a per-folder plans/archive/ (via git mv,
history preserved) so each plans/ folder surfaces only live work:

  shipped (archived): 122   in-progress: 8   queued: 7   abandoned: 4

docs/plans/ is the frozen legacy folder; its plans were stamped and
indexed in place (48 of 52 archived) but it remains closed to new plans.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_016hpUivtmq4pgzqRbY6MYrA
2026-06-30 15:35:38 +00:00

146 lines
6.2 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# T16 closure roadmap — full coverage with correct behaviours
> **Status:** in-progress — Priorities 1 & 2 closed and the suite passes in-suite, but P3 (CI gating) is deferred and the framesPerGroup rerun + two upstream items remain open, so the roadmap's "fully closed" goal is not reached.
> _Audited 2026-06-30._
**Goal state.** Every spec'd cross-stack scenario green in suite-mode
sweeps, asserting its full design intent (no soft-passes, no vacuous
threshold loosening), with CI gating live and stable.
**Where we are.** The merged `claude/cross-stack-interop-test-XAbYB`
branch ships 22 of 23 spec'd scenarios; each passes individually.
Suite-mode runs hit a residual moq-relay 0.10.x routing race on a
specific subset (~40-60% flake rate). Five scenarios soft-pass the
listener side as a known-flake mitigation. CI is intentionally
unwired pending stability.
This roadmap takes the suite from "passes individually" to "passes
in suite + CI" through three sequential plans. None should be
parallelized — each unblocks the next.
## Priority 1 — `2026-05-07-moq-relay-routing-investigation.md` ✅ CLOSED
> **Closed 2026-05-07** by merging `origin/main` (five `:quic`
> commits: `2a4c07ae`, `d5c854be`, `b622d0c9`, `86a4727e`,
> `31d19258`). The flake was a `:quic` packet-acceptance bug, not
> a moq-relay routing race. Step 1 trace capture in this branch
> first disproved the moq-relay-routing hypothesis (relay
> correctly forwards the upstream SUBSCRIBE); the QUIC team's
> separate work landed in main between the merge base and pickup
> and incidentally closed the speaker-side post-handshake bidi
> drop.
**What landed.**
- A 5-commit merge from `origin/main` carrying ALPN-list
threading, PTO STREAM retransmits, RFC 9001 §6 1-RTT key
update, multiconnect/multiplex pacing, and qlog flush.
- Per-test moq-relay TRACE capture instrumentation
(commit `d7f87971`) — kept in place; useful for follow-up
regression triage.
- Cross-stack trace artefacts preserved at
`nestsClient/plans/artefacts/2026-05-07-routing-race-disproven/`
for post-mortem reference.
**Acceptance bar met.** 5/5 sweep BUILD SUCCESSFUL on
HangInteropTest with their current soft-pass assertions intact.
55/55 tests pass.
## Priority 2 — `2026-05-07-tighten-cross-stack-assertions.md` ✅ CLOSED
> **Closed 2026-05-07** by commits `04be38ad` (initial tightening)
> and `029329af` (recalibration of two floors against empirical
> post-merge steady state). Verification sweep:
> **5/5 BUILD SUCCESSFUL × 22 tests = 110/110 hard-pass** on
> `./gradlew :nestsClient:jvmTest --tests HangInteropTest --tests
> BrowserInteropTest -DnestsHangInterop=true
> -DnestsBrowserInterop=true --rerun-tasks`.
**What landed.**
- 7 BrowserInteropTest scenarios + the
`runBrowserPublishKotlinListen` helper get hard sample-count
floors (no `return@runBlocking` short-circuits remain).
- One scenario (`chromium_listener_speaker_hot_swap_does_not_crash`)
hard-asserts a weaker bound than originally specced — the
Chromium `@moq/lite` 0.2.x client only captures ~100–160 ms
across the swap; the hang-tier counterpart still hard-asserts
the full post-swap 440 Hz peak so T12 protection is intact.
Deferred follow-up tracked in
`2026-05-06-cross-stack-interop-test-results.md`.
- Gap matrix updated.
**Acceptance bar met.** 5/5 sweep with hard assertions.
## Priority 3 — `2026-05-07-cross-stack-interop-ci-gating.md` ⏸ DEFERRED (manual run only)
> **Briefly wired then reverted, 2026-05-07.** Commit `21947bc5`
> re-added both jobs to `build.yml`; verification gave 10/10
> sweep × 22 tests = 220/220 hard-pass on the agent rig. A
> subsequent maintainer review judged the cold-cache cost
> (~10 min hang, ~13 min browser) too high for the change-pattern
> (most PRs don't touch audio / MoQ / QUIC) and removed the jobs.
>
> The suites stay green locally and are intended to run before
> merging any change that touches the audio / moq-lite / `:quic`
> stack. Documentation: [`nestsClient/tests/README.md`](../tests/README.md)
> covers when/how/prerequisites/debugging.
>
> The CI-gating plan is kept around in case the wallclock cost
> calculus changes (e.g., a much faster runner, or a smaller
> opt-in subset of the suite that runs in <2 min).
## Independent track — `2026-05-07-framespergroup-production-rerun.md`
This one **doesn't block the closure roadmap**. It can run any
time after Priority 1 is done; it settles whether the test pin
(5) and production default (50) can converge, or whether they
must remain different. Either outcome is shippable.
**What lands.**
- Logcat data from a fresh two-phone field test against current
nostrnests production at multiple `framesPerGroup` values.
- A data-driven decision on whether to change the production
default, the test pin, or neither.
**Why it's parallelizable.** Doesn't gate the test suite or CI;
it gates a one-line code change to `NestMoqLiteBroadcaster`'s
default constant.
## After all four close — what remains
Two open items, both genuinely upstream:
1. **I7 post-reconnect listener cliff** —
`2026-05-07-i7-post-reconnect-cliff-investigation.md`. The I7
reverse scenario passes its 2.5 s threshold but a regression
test of "all post-reconnect data arrives" would require the
moq-relay 0.10.x per-broadcast forward queue fix. Same upstream
class as the routing race.
2. **I12 GOAWAY** — only re-emerges if an IETF moq-transport
target lands (currently moq-lite-03 only). Tracked in
`2026-05-06-cross-stack-interop-test-results.md`.
Beyond those: T16 reaches "full coverage with correct behaviours"
when this roadmap closes.
## Estimated wallclock
- Priority 1: 1–2 days (depends on whether upstream version bump
fixes it, or we have to file + wait for upstream).
- Priority 2: 0.5 day (mechanical replacement of soft-passes
with floors, plus rerun verification).
- Priority 3: 0.5 day (re-add CI jobs, run the 10× sweep, merge).
- Independent track (framesPerGroup): 0.5 day (needs prod-rig
access).
Total: 2.5–3.5 days of focused work to take T16 from "infra
shipped" to "fully closed".
## Plan files
- `2026-05-07-moq-relay-routing-investigation.md`
- `2026-05-07-tighten-cross-stack-assertions.md`
- `2026-05-07-cross-stack-interop-ci-gating.md`
- `2026-05-07-framespergroup-production-rerun.md`
- (this file) `2026-05-07-t16-closure-roadmap.md`