issue: update 573b and 820a - baseline analysis complete, VPS upgrade required

This commit is contained in:
DanConwayDev
2026-01-19 10:46:46 +00:00
parent 775b6caa6a
commit 835995a59e
2 changed files with 83 additions and 0 deletions
+40
View File
@@ -502,6 +502,46 @@ Currently relay.ngit.dev runs ngit-relay (reference implementation). Before migr
3. Use baseline for relay.ngit.dev migration decision (issue 820a) 3. Use baseline for relay.ngit.dev migration decision (issue 820a)
4. Consider fixing container stats/FD counts in future if needed 4. Consider fixing container stats/FD counts in future if needed
### 2026-01-19 [Session 11:35] - Baseline Analysis Complete ✅
- Completed: Comprehensive analysis of 36 hours of baseline metrics (2026-01-17 23:30 to 2026-01-19 11:35 UTC)
- **CRITICAL FINDINGS:**
1. **CPU severely overloaded:** Average 6.96 load (348% utilization on 2 cores), peak 11.83 (592%)
2. **Memory maxed out:** 96.8% average usage, only 130MB available (3.2% free)
3. **Swap heavily used:** 2.0GB average (40% of 5GB), growing over time (0.75GB → 2.5GB)
4. **Connections NOT the problem:** Only 28-31 per relay (avg), 120-126 peak (3% of 4096 limit)
5. **Load does NOT correlate with connections:** 0.210 correlation (weak) - confirms git operations are bottleneck
- **Peak Usage Patterns:**
- Peak hours: 16:00-20:00 UTC (load 6.5-9.9, connections 865-977)
- Off-peak hours: 00:00-12:00 UTC (load 6.3-7.4, connections 350-470)
- **Key insight:** Even off-peak shows HIGH load (6.3-7.4), indicating baseline overload independent of traffic
- **Capacity Analysis:**
- Current: 2 cores (348% utilized), 3.8GB RAM (96.8% utilized)
- Required minimum: 4 cores, 8GB RAM (survival mode)
- **Recommended: 6 cores, 8GB RAM** (healthy operation + migration headroom)
- Optimal: 8 cores, 16GB RAM (future-proof)
- **Migration Impact Assessment:**
- **Current VPS (2-core, 4GB):** 🔴 HIGH RISK - Do NOT migrate relay.ngit.dev
- **After upgrade to 4-core, 8GB:** 🟡 MEDIUM RISK - Proceed with caution
- **After upgrade to 6-core, 8GB:** 🟢 LOW RISK - Recommended safe path
- **After upgrade to 8-core, 16GB:** 🟢 LOW RISK - Optimal choice
- **Data Quality Assessment:**
- ✅ 36 hours continuous collection, 2,160 data points (60s intervals)
- ✅ No gaps or missing data
- ✅ Critical metrics working reliably
- ✅ Clear patterns identified (peak hours, resource bottlenecks)
- ✅ **Sufficient for migration decision** - no need for additional collection
- **Recommendations:**
1. **CRITICAL:** Upgrade VPS to 6-core, 8GB RAM BEFORE migrating relay.ngit.dev
2. Verify upgrade impact (24-48 hours monitoring)
3. Update migration timeline: Day 0-1 (VPS upgrade), Day 2-3 (prep), Day 4-5 (migrate), Day 5-7 (monitor)
4. Medium-term: Optimize git operations (global semaphore, nice processes, event-driven sync)
5. Long-term: Plan for growth (may need 8-core, 16GB within 6-12 months)
- **Files Created:**
- `/tmp/vps-baseline-report.md` - Comprehensive 36-hour analysis report
- Analysis scripts: `/tmp/analyze_metrics.py`, `/tmp/hourly_analysis.py`
- **Status:** Baseline collection COMPLETE ✅ - Proceed with VPS upgrade planning
- **Next:** Update issue 820a with migration decision (VPS upgrade required first)
### 2026-01-16 [Phase 0 Step 1 - Initial Scripts] ### 2026-01-16 [Phase 0 Step 1 - Initial Scripts]
- Completed: Created three bash diagnostic scripts - Completed: Created three bash diagnostic scripts
- Issue: Scripts not compatible with NixOS declarative philosophy - Issue: Scripts not compatible with NixOS declarative philosophy
+43
View File
@@ -250,6 +250,49 @@ docker start ngit-relay
3. Make migration decision based on baseline analysis 3. Make migration decision based on baseline analysis
4. Proceed with rapid preparation if baseline looks good 4. Proceed with rapid preparation if baseline looks good
### 2026-01-19 [Session 11:35] - Baseline Analysis Complete - VPS UPGRADE REQUIRED ⚠️
- Completed: Comprehensive analysis of 36 hours of baseline metrics
- **CRITICAL DECISION: Migration BLOCKED until VPS upgrade**
- **Baseline Findings (2026-01-17 23:30 to 2026-01-19 11:35 UTC):**
- **CPU:** Average 6.96 load (348% utilization), peak 11.83 (592%) - 🔴 SEVERELY OVERLOADED
- **Memory:** 96.8% average usage, only 130MB available - 🔴 MAXED OUT
- **Swap:** 2.0GB average (40% of 5GB), growing 0.75GB → 2.5GB - 🟡 HEAVILY USED
- **Connections:** Port 8081: 28 avg/120 peak, Port 8083: 31 avg/126 peak - ✅ ONLY 3% OF CAPACITY
- **Correlation:** Load vs connections = 0.210 (weak) - Confirms git operations are bottleneck, not connections
- **Peak Usage Patterns:**
- Peak hours: 16:00-20:00 UTC (load 6.5-9.9, connections 865-977)
- Off-peak hours: 00:00-12:00 UTC (load 6.3-7.4, connections 350-470)
- **Critical insight:** Even off-peak shows HIGH load (6.3-7.4), indicating baseline overload independent of traffic
- **Migration Risk Assessment:**
- **Current VPS (2-core, 4GB):** 🔴 **HIGH RISK** - Migration will add load spike to already overloaded system
- **Outcome:** High probability of service degradation or outages during migration
- **Recommendation:** ❌ **DO NOT MIGRATE** on current VPS
- **VPS Upgrade Requirements:**
- **Minimum (Survival):** 4 cores, 8GB RAM (~$20-40/month) - 🟡 MEDIUM RISK
- **Recommended (Healthy):** 6 cores, 8GB RAM (~$40-60/month) - 🟢 LOW RISK ✅
- **Optimal (Future-proof):** 8 cores, 16GB RAM (~$60-100/month) - 🟢 LOW RISK
- **Decision:** Upgrade to 6-core, 8GB minimum before migration
- **Updated Migration Timeline:**
- **REVISED:** 5-7 days total (was 3-5 days)
- **Day 0-1:** VPS upgrade + verification (NEW - CRITICAL)
- **Day 2-3:** Rapid preparation
- **Day 4-5:** Migration execution
- **Day 5-7:** Intensive monitoring
- **Data Quality:**
- ✅ 36 hours continuous collection, 2,160 data points
- ✅ Clear patterns identified, no anomalies
- ✅ **Sufficient for migration decision** - no additional collection needed
- ✅ Findings are conclusive: VPS upgrade required
- **Next Steps:**
1. **CRITICAL:** Upgrade VPS to 6-core, 8GB RAM (BLOCKER for migration)
2. Verify upgrade impact (24-48 hours monitoring, expect load to drop to ~60-70%)
3. Proceed with accelerated migration plan (Day 2-7)
4. Monitor intensively during and after migration
- **Files Created:**
- `/tmp/vps-baseline-report.md` - Comprehensive 36-hour analysis with migration scenarios
- **Status:** Baseline complete ✅, Migration BLOCKED ⚠️ pending VPS upgrade
- **Blocker:** VPS upgrade to 6-core, 8GB RAM required before migration can proceed
## Notes ## Notes
- **Related issue:** 573b-production-timeout-diagnosis.md (timeout investigation that led to this) - **Related issue:** 573b-production-timeout-diagnosis.md (timeout investigation that led to this)