mirror of
https://relay.ngit.dev/npub15qydau2hjma6ngxkl2cyar74wzyjshvl65za5k5rl69264ar2exs5cyejr/ngit-grasp.git
synced 2026-10-05 15:08:24 +00:00
issue: update 573b and 820a - baseline analysis complete, VPS upgrade required
This commit is contained in:
@@ -502,6 +502,46 @@ Currently relay.ngit.dev runs ngit-relay (reference implementation). Before migr
|
|||||||
3. Use baseline for relay.ngit.dev migration decision (issue 820a)
|
3. Use baseline for relay.ngit.dev migration decision (issue 820a)
|
||||||
4. Consider fixing container stats/FD counts in future if needed
|
4. Consider fixing container stats/FD counts in future if needed
|
||||||
|
|
||||||
|
### 2026-01-19 [Session 11:35] - Baseline Analysis Complete ✅
|
||||||
|
- Completed: Comprehensive analysis of 36 hours of baseline metrics (2026-01-17 23:30 to 2026-01-19 11:35 UTC)
|
||||||
|
- **CRITICAL FINDINGS:**
|
||||||
|
1. **CPU severely overloaded:** Average 6.96 load (348% utilization on 2 cores), peak 11.83 (592%)
|
||||||
|
2. **Memory maxed out:** 96.8% average usage, only 130MB available (3.2% free)
|
||||||
|
3. **Swap heavily used:** 2.0GB average (40% of 5GB), growing over time (0.75GB → 2.5GB)
|
||||||
|
4. **Connections NOT the problem:** Only 28-31 per relay (avg), 120-126 peak (3% of 4096 limit)
|
||||||
|
5. **Load does NOT correlate with connections:** 0.210 correlation (weak) - confirms git operations are bottleneck
|
||||||
|
- **Peak Usage Patterns:**
|
||||||
|
- Peak hours: 16:00-20:00 UTC (load 6.5-9.9, connections 865-977)
|
||||||
|
- Off-peak hours: 00:00-12:00 UTC (load 6.3-7.4, connections 350-470)
|
||||||
|
- **Key insight:** Even off-peak shows HIGH load (6.3-7.4), indicating baseline overload independent of traffic
|
||||||
|
- **Capacity Analysis:**
|
||||||
|
- Current: 2 cores (348% utilized), 3.8GB RAM (96.8% utilized)
|
||||||
|
- Required minimum: 4 cores, 8GB RAM (survival mode)
|
||||||
|
- **Recommended: 6 cores, 8GB RAM** (healthy operation + migration headroom)
|
||||||
|
- Optimal: 8 cores, 16GB RAM (future-proof)
|
||||||
|
- **Migration Impact Assessment:**
|
||||||
|
- **Current VPS (2-core, 4GB):** 🔴 HIGH RISK - Do NOT migrate relay.ngit.dev
|
||||||
|
- **After upgrade to 4-core, 8GB:** 🟡 MEDIUM RISK - Proceed with caution
|
||||||
|
- **After upgrade to 6-core, 8GB:** 🟢 LOW RISK - Recommended safe path
|
||||||
|
- **After upgrade to 8-core, 16GB:** 🟢 LOW RISK - Optimal choice
|
||||||
|
- **Data Quality Assessment:**
|
||||||
|
- ✅ 36 hours continuous collection, 2,160 data points (60s intervals)
|
||||||
|
- ✅ No gaps or missing data
|
||||||
|
- ✅ Critical metrics working reliably
|
||||||
|
- ✅ Clear patterns identified (peak hours, resource bottlenecks)
|
||||||
|
- ✅ **Sufficient for migration decision** - no need for additional collection
|
||||||
|
- **Recommendations:**
|
||||||
|
1. **CRITICAL:** Upgrade VPS to 6-core, 8GB RAM BEFORE migrating relay.ngit.dev
|
||||||
|
2. Verify upgrade impact (24-48 hours monitoring)
|
||||||
|
3. Update migration timeline: Day 0-1 (VPS upgrade), Day 2-3 (prep), Day 4-5 (migrate), Day 5-7 (monitor)
|
||||||
|
4. Medium-term: Optimize git operations (global semaphore, nice processes, event-driven sync)
|
||||||
|
5. Long-term: Plan for growth (may need 8-core, 16GB within 6-12 months)
|
||||||
|
- **Files Created:**
|
||||||
|
- `/tmp/vps-baseline-report.md` - Comprehensive 36-hour analysis report
|
||||||
|
- Analysis scripts: `/tmp/analyze_metrics.py`, `/tmp/hourly_analysis.py`
|
||||||
|
- **Status:** Baseline collection COMPLETE ✅ - Proceed with VPS upgrade planning
|
||||||
|
- **Next:** Update issue 820a with migration decision (VPS upgrade required first)
|
||||||
|
|
||||||
### 2026-01-16 [Phase 0 Step 1 - Initial Scripts]
|
### 2026-01-16 [Phase 0 Step 1 - Initial Scripts]
|
||||||
- Completed: Created three bash diagnostic scripts
|
- Completed: Created three bash diagnostic scripts
|
||||||
- Issue: Scripts not compatible with NixOS declarative philosophy
|
- Issue: Scripts not compatible with NixOS declarative philosophy
|
||||||
|
|||||||
@@ -250,6 +250,49 @@ docker start ngit-relay
|
|||||||
3. Make migration decision based on baseline analysis
|
3. Make migration decision based on baseline analysis
|
||||||
4. Proceed with rapid preparation if baseline looks good
|
4. Proceed with rapid preparation if baseline looks good
|
||||||
|
|
||||||
|
### 2026-01-19 [Session 11:35] - Baseline Analysis Complete - VPS UPGRADE REQUIRED ⚠️
|
||||||
|
- Completed: Comprehensive analysis of 36 hours of baseline metrics
|
||||||
|
- **CRITICAL DECISION: Migration BLOCKED until VPS upgrade**
|
||||||
|
- **Baseline Findings (2026-01-17 23:30 to 2026-01-19 11:35 UTC):**
|
||||||
|
- **CPU:** Average 6.96 load (348% utilization), peak 11.83 (592%) - 🔴 SEVERELY OVERLOADED
|
||||||
|
- **Memory:** 96.8% average usage, only 130MB available - 🔴 MAXED OUT
|
||||||
|
- **Swap:** 2.0GB average (40% of 5GB), growing 0.75GB → 2.5GB - 🟡 HEAVILY USED
|
||||||
|
- **Connections:** Port 8081: 28 avg/120 peak, Port 8083: 31 avg/126 peak - ✅ ONLY 3% OF CAPACITY
|
||||||
|
- **Correlation:** Load vs connections = 0.210 (weak) - Confirms git operations are bottleneck, not connections
|
||||||
|
- **Peak Usage Patterns:**
|
||||||
|
- Peak hours: 16:00-20:00 UTC (load 6.5-9.9, connections 865-977)
|
||||||
|
- Off-peak hours: 00:00-12:00 UTC (load 6.3-7.4, connections 350-470)
|
||||||
|
- **Critical insight:** Even off-peak shows HIGH load (6.3-7.4), indicating baseline overload independent of traffic
|
||||||
|
- **Migration Risk Assessment:**
|
||||||
|
- **Current VPS (2-core, 4GB):** 🔴 **HIGH RISK** - Migration will add load spike to already overloaded system
|
||||||
|
- **Outcome:** High probability of service degradation or outages during migration
|
||||||
|
- **Recommendation:** ❌ **DO NOT MIGRATE** on current VPS
|
||||||
|
- **VPS Upgrade Requirements:**
|
||||||
|
- **Minimum (Survival):** 4 cores, 8GB RAM (~$20-40/month) - 🟡 MEDIUM RISK
|
||||||
|
- **Recommended (Healthy):** 6 cores, 8GB RAM (~$40-60/month) - 🟢 LOW RISK ✅
|
||||||
|
- **Optimal (Future-proof):** 8 cores, 16GB RAM (~$60-100/month) - 🟢 LOW RISK
|
||||||
|
- **Decision:** Upgrade to 6-core, 8GB minimum before migration
|
||||||
|
- **Updated Migration Timeline:**
|
||||||
|
- **REVISED:** 5-7 days total (was 3-5 days)
|
||||||
|
- **Day 0-1:** VPS upgrade + verification (NEW - CRITICAL)
|
||||||
|
- **Day 2-3:** Rapid preparation
|
||||||
|
- **Day 4-5:** Migration execution
|
||||||
|
- **Day 5-7:** Intensive monitoring
|
||||||
|
- **Data Quality:**
|
||||||
|
- ✅ 36 hours continuous collection, 2,160 data points
|
||||||
|
- ✅ Clear patterns identified, no anomalies
|
||||||
|
- ✅ **Sufficient for migration decision** - no additional collection needed
|
||||||
|
- ✅ Findings are conclusive: VPS upgrade required
|
||||||
|
- **Next Steps:**
|
||||||
|
1. **CRITICAL:** Upgrade VPS to 6-core, 8GB RAM (BLOCKER for migration)
|
||||||
|
2. Verify upgrade impact (24-48 hours monitoring, expect load to drop to ~60-70%)
|
||||||
|
3. Proceed with accelerated migration plan (Day 2-7)
|
||||||
|
4. Monitor intensively during and after migration
|
||||||
|
- **Files Created:**
|
||||||
|
- `/tmp/vps-baseline-report.md` - Comprehensive 36-hour analysis with migration scenarios
|
||||||
|
- **Status:** Baseline complete ✅, Migration BLOCKED ⚠️ pending VPS upgrade
|
||||||
|
- **Blocker:** VPS upgrade to 6-core, 8GB RAM required before migration can proceed
|
||||||
|
|
||||||
## Notes
|
## Notes
|
||||||
|
|
||||||
- **Related issue:** 573b-production-timeout-diagnosis.md (timeout investigation that led to this)
|
- **Related issue:** 573b-production-timeout-diagnosis.md (timeout investigation that led to this)
|
||||||
|
|||||||
Reference in New Issue
Block a user